Here’s what’s new at the house this week
Garage door is in
Extra wide master bedroom door
Powder room sink and toilet installed
Master bedroom ensuite sinks and taps in. We will add two mirrors post handover and change the two lights to wall sconce above mirrors
Master ensuite rain dumper at one end of shower
Main bath hob
Main bathroom sink and tap
Guest ensuite shower
Guest ensuite sink and tap
Main bath (currently sitting in upstairs rumpus room)
Laundry sink and tap
Galley sink and tap
Kitchen bin
Kitchen double sink and hose
Rear garage roller door for access to backyard
Your house is looking great. We are just behind you with our Waldorf Grange build. Do you have any idea of your estimated hand over date. We noticed the cut out for your gas fire place in the lounge. Will PD be installing the gas fire or are you getting it installed post hand over? How did you go with getting the scratched kitchen cupboard doors and drawers replaced?
LikeLiked by 1 person
We are getting the fireplace post handover. No news on a handover date and the kitchen cupboards are still scratched. Haven’t heard from our site supervisor in a couple of weeks.
LikeLike
Looks awesome 🙂 !
LikeLike
looks amazing, we r building Waldorf Grange too.
but my bathroom tiles didn’t looked what i wanted. the marble tiles where in the same pattern in a row. hope they can do something about it!!
LikeLike
Were the tiles meant to be brick lay instead of straight lay?
LikeLike