Very exciting today to head out to the block and see that some of the windows and the roof have been added. It is really staring to take shape and look like a house. I am very pleased with our choice of roof now that I can see it in the flesh instead of just a small sample piece. We originally had Surfmist gutters, but changed these to Basalt to match the roof at the last minute. I am really glad we did this as when you stand closer tot he house you can’t actually see the roof, just the gutter and fascia and I like the gutter being dark as it adds a ‘frame’ around the top of the house from below.


Basalt roof and gutters with Surfmist edging.




Inside roof.

We were also able to see that some of the items that were on our Darbecca slab/frame inspection report (see previous blog) have been rectified. There are still more rectifications needed which should happen over the coming weeks.

Screenshot 2017-05-27 12.51.43

Before – Incorrect noggings. 

Screenshot 2017-05-27 12.51.20


After – further support added. 

Screenshot 2017-05-27 12.54.56

Before – Garage steel column before extra support added.


After – Added support under steel beam.

Screenshot 2017-05-27 12.55.07

Before – Gap under garage boundary frame.


After – With structural grout added.



Screenshot 2017-05-27 12.54.33

Before – Support missing under steel beam.


After – Rectified with grout added under steel beam.



Before – Missing supports.




After – Additional supports added.


View from back of house from the top floor. 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s